Empennage Is Built

Well about 90%, things have been slow on the blog, but not in the shop. The Empennage has so many little parts and pieces from the hinges to the support braces, servo tabs, flying wire attach points, doublers, elevators, rudder and I could go on and on. Something that looks fairly strait forward is truly quite a complex structure. Have a look…

This is starting to get quite exciting. Over the next few weeks we will be mating the top wing, fuselage and bottom wings. This will be the first picture of the major components all assembled for the first time. Then we will be building the Ailerons, installing the control system and test rigging everything. Then the wings come back off, apply the leading edges and aileron coves, seal and cover…

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

%d bloggers like this: